WUE_CALC

Water Usage Effectiveness — litres of site water per IT kWh, accumulated over a reporting period with gap accounting.

Validated application blockDCIM · MetricsIEC 61131-3IEC 61499v1.0.0

When to use it

Use WUE_CALC when an evaporatively cooled site meters its makeup water and its IT load, and has to report litres per IT kWh for a sustainability disclosure or a local abstraction licence.

Interface

The published port signature. This is the whole of what the block exposes to your program — the implementation body is not shown here and ships with the download.

Inputs

PortTypeUnit
ENABLEBOOL
WATER_LPMREALL/min
IT_KWREALkW
WTR_OKBOOL
PWR_OKBOOL
CYCLETIME
MIN_KWHREALkWh
WUE_HIREALL/kWh
WUE_DBREALL/kWh
GAP_DLYTIME
DRY_MIN_KWREALkW
DRY_DLYTIME
RESETBOOL
ACKBOOL

Outputs

PortTypeUnit
WUEREALL/kWh
WUE_LASTREALL/kWh
WUE_LAST_VALIDBOOL
WATER_LLREALL
IT_KWHLREALkWh
PERIOD_PCTREAL%
GAP_SREALs
GAP_S_LASTREALs
VALIDBOOL
ALM_MTR_FAULTBOOL
ALM_WUE_HIGHBOOL
ALM_DATA_GAPBOOL
ALM_CFG_ERRBOOL

IEC 61499 event interface

EI INIT, REQ·EO INITO, CNF

Validation evidence

Tests
12
Simulated scans
2155
Simulator
v0.1.0

Complete IEC 61131-3 implementation with a published test suite that runs on the vplant simulator. The counts above are that suite, executed on this build.

  • Conforms to IEC 61131-3
  • Conforms to IEC 61499

Download WUE_CALC — free

Create a free Ri Tech account to download the block. You get the Structured Text body, the Rockwell Add-On Instruction (.L5X), the Schneider Control Expert DFB (.XDB), PLCopen XML, the IEC 61499 function block type (.fbt) and the datasheet.

Every block in the catalogue is free to download, in every format, with no purchase and no card. Browsing needs no account at all; downloading needs a signed-in one, so the block lands in your library and re-downloads whenever you need it.

Source is never published on this page. The implementation is released to a signed-in Ri Tech account — free of charge, but never anonymously.