SOLAR_EV_DIVERT

Solar self-consumption — diverts the PV surplus to EV charging without the diversion chasing its own load.

Validated application blockEV · Site EnergyIEC 61131-3IEC 61499v1.0.0

When to use it

Use SOLAR_EV_DIVERT when a site has on-site PV and wants the vehicles charged from the surplus that would otherwise be exported, with the operator able to choose between strict solar-only, solar plus a small grid top-up, and unrestricted charging.

Interface

The published port signature. This is the whole of what the block exposes to your program — the implementation body is not shown here and ships with the download.

Inputs

PortTypeUnit
ENABLEBOOL
PV_KWREALkW
SITE_LOAD_KWREALkW
EV_KW_ACTREALkW
MODEUSINT
PV_OKBOOL
EV_MIN_KWREALkW
EV_KW_MAXREALkW
TOPUP_KWREALkW
FILT_SREALs
START_DLYTIME
STOP_DLYTIME

Outputs

PortTypeUnit
EV_KW_AVAILREALkW
SURPLUS_KWREALkW
EXPORT_KWREALkW
CHARGE_PERMITBOOL
ALM_PV_FAULTBOOL
ALM_CFG_ERRBOOL
VALIDBOOL

IEC 61499 event interface

EI INIT, REQ·EO INITO, CNF

Validation evidence

Tests
10
Simulated scans
351
Simulator
v0.1.0

Complete IEC 61131-3 implementation with a published test suite that runs on the vplant simulator. The counts above are that suite, executed on this build.

  • Conforms to IEC 61131-3
  • Conforms to IEC 61499

Download SOLAR_EV_DIVERT — free

Create a free Ri Tech account to download the block. You get the Structured Text body, the Rockwell Add-On Instruction (.L5X), the Schneider Control Expert DFB (.XDB), PLCopen XML, the IEC 61499 function block type (.fbt) and the datasheet.

Every block in the catalogue is free to download, in every format, with no purchase and no card. Browsing needs no account at all; downloading needs a signed-in one, so the block lands in your library and re-downloads whenever you need it.

Source is never published on this page. The implementation is released to a signed-in Ri Tech account — free of charge, but never anonymously.