RECONNECT_SUPERVISOR

IEEE 1547 return-to-service supervision: withholds the reconnect permissive until voltage and frequency have held the window for the full stabilization period.

Validated application blockMG · PCC & ProtectionIEC 61131-3v1.0.0

When to use it

Use RECONNECT_SUPERVISOR when a DER or microgrid has ceased to energize and must not return until the area EPS has been demonstrably stable for the period in its interconnection agreement — typically five minutes.

Interface

The published port signature. This is the whole of what the block exposes to your program — the implementation body is not shown here and ships with the download.

Inputs

PortTypeUnit
ENABLEBOOL—
V_PUREALpu
FREQREALHz
MEAS_OKBOOL—
BLOCK_INBOOL—
V_LO_PUREALpu
V_HI_PUREALpu
F_LO_HZREALHz
F_HI_HZREALHz
STABLE_TTIME—

Outputs

PortType
PERMITBOOL
BLOCKBOOL
T_REMAINTIME
IN_WINDOWBOOL
RESTARTSUDINT
ALM_MEAS_FAULTBOOL
ALM_CFG_ERRBOOL

Validation evidence

Tests
7
Simulated scans
170
Simulator
v0.1.0

Complete IEC 61131-3 implementation with a published test suite that runs on the vplant simulator. The counts above are that suite, executed on this build.

  • Conforms to IEC 61131-3

Download RECONNECT_SUPERVISOR — free

Create a free Ri Tech account to download the block. You get the Structured Text body, the Rockwell Add-On Instruction (.L5X), the Schneider Control Expert DFB (.XDB), PLCopen XML and the datasheet.

Every block in the catalogue is free to download, in every format it ships, with no purchase and no card. Browsing needs no account at all; downloading needs a signed-in one, so the block lands in your library and re-downloads whenever you need it.

Source is never published on this page. The implementation is released to a signed-in Ri Tech account — free of charge, but never anonymously.