OZONE_CTRL

Storage-tank ozonation PI controller with anti-windup and a measured pre-distribution UV destruct permissive.

Validated application blockLS · Water SystemsIEC 61131-3IEC 61499v1.0.0

When to use it

Use OZONE_CTRL when a purified-water storage tank is held sanitised with a dissolved-ozone residual controlled on ORP, and the water must pass a UV destruct unit before it reaches the distribution loop and the points of use.

Interface

The published port signature. This is the whole of what the block exposes to your program — the implementation body is not shown here and ships with the download.

Inputs

PortTypeUnit
ENABLEBOOL
SANITIZE_REQBOOL
ORP_PVREALmV
ORP_OKBOOL
ORP_SPREALmV
ORP_POSTREALmV
ORP_POST_OKBOOL
UV_DESTRUCTBOOL
DIST_REQBOOL
KPREAL%/mV
TIREALs
OZONE_MINREAL%
OZONE_MAXREAL%
RESIDUAL_MINREALmV
DEST_MAXREALmV
DEST_CONFIRMTIME
RESID_TMOTIME
ACKBOOL

Outputs

PortTypeUnit
OZONE_PCTREAL%
RESIDUAL_OKBOOL
DIST_PERMITBOOL
ALM_RESIDUAL_LOWBOOL
ALM_NO_DESTRUCTBOOL
ALM_ORP_FAULTBOOL
ALM_CFG_ERRBOOL

IEC 61499 event interface

EI INIT, REQ·EO INITO, CNF

Validation evidence

Tests
8
Simulated scans
167
Simulator
v0.1.0

Complete IEC 61131-3 implementation with a published test suite that runs on the vplant simulator. The counts above are that suite, executed on this build.

  • Conforms to IEC 61131-3
  • Conforms to IEC 61499

Download OZONE_CTRL — free

Create a free Ri Tech account to download the block. You get the Structured Text body, the Rockwell Add-On Instruction (.L5X), the Schneider Control Expert DFB (.XDB), PLCopen XML, the IEC 61499 function block type (.fbt) and the datasheet.

Every block in the catalogue is free to download, in every format, with no purchase and no card. Browsing needs no account at all; downloading needs a signed-in one, so the block lands in your library and re-downloads whenever you need it.

Source is never published on this page. The implementation is released to a signed-in Ri Tech account — free of charge, but never anonymously.