ENERGY_BASELINE

Daily energy totalising against a baseline, compared PRO RATA through the day with an end-of-period projection and gap accounting.

Validated application blockDCIM · MetricsIEC 61131-3IEC 61499v1.0.0

When to use it

Use ENERGY_BASELINE when a site or a hall has a metered kW and an agreed daily energy baseline — last year's metered day, a contracted allowance, or a model output — and needs to know before the day ends whether it is running over.

Interface

The published port signature. This is the whole of what the block exposes to your program — the implementation body is not shown here and ships with the download.

Inputs

PortTypeUnit
ENABLEBOOL
KWREALkW
BASELINE_KWH_DREALkWh
CYCLETIME
MTR_OKBOOL
MIN_FRAC_PCTREAL%
OVER_PCTREAL%
OVER_DBREAL%
GAP_DLYTIME
RESETBOOL
ACKBOOL

Outputs

PortTypeUnit
KWH_TODAYLREALkWh
VS_BASE_PCTREAL%
KWH_YDAYLREALkWh
PROJ_KWH_DREALkWh
EXCESS_KWHREALkWh
PERIOD_PCTREAL%
GAP_SREALs
GAP_S_LASTREALs
VALIDBOOL
ALM_MTR_FAULTBOOL
ALM_OVER_BASEBOOL
ALM_DATA_GAPBOOL
ALM_CFG_ERRBOOL

IEC 61499 event interface

EI INIT, REQ·EO INITO, CNF

Validation evidence

Tests
14
Simulated scans
3646
Simulator
v0.1.0

Complete IEC 61131-3 implementation with a published test suite that runs on the vplant simulator. The counts above are that suite, executed on this build.

  • Conforms to IEC 61131-3
  • Conforms to IEC 61499

Download ENERGY_BASELINE — free

Create a free Ri Tech account to download the block. You get the Structured Text body, the Rockwell Add-On Instruction (.L5X), the Schneider Control Expert DFB (.XDB), PLCopen XML, the IEC 61499 function block type (.fbt) and the datasheet.

Every block in the catalogue is free to download, in every format, with no purchase and no card. Browsing needs no account at all; downloading needs a signed-in one, so the block lands in your library and re-downloads whenever you need it.

Source is never published on this page. The implementation is released to a signed-in Ri Tech account — free of charge, but never anonymously.